Engineered for Critical Temporary Environments
| Model | ProForce S-28.9 | ProForce T-42.3 | ProForce C-53 | ProForce EX-44 |
|---|---|---|---|---|
| Cooling capacity | 28.9kW (10HP) | 42.3kW (14HP) | 53kW (18HP) | 44kW (15HP) |
| Apparent cooling capacity | 25.1kW | 37.6kW | 46.2kW | 38.9kW |
| Heating capacity (heat pump model) | 31.2kW | 46.5kW | 58.1kW | 47.8kW |
| COP (Cooling) | 3.8 | 3.6 | 3.5 | 3.4 |
| EER | 3.14 | 3.23 | 3.17 | 3.05 |
| Air supply volume | 3,800m³/h | 5,500m³/h | 7,200m³/h | 4,900m³/h |
| External static pressure | 150Pa | 200Pa | 250Pa | 180Pa |
Structural characteristics
| Parameter item | Specification Description | Industrial scene |
| Shell material | Aluminized zinc steel plate + anti-UV coating | corrosion resistant AC enclosure |
| Protection grade | IP55 (ISO 20653) | dust proof industrial housing |
| Compressor type | Vortex type (with seismic support | shockproof scroll compressor |
| Fan type | EC backward-inclined centrifugal fan | high static pressure blower |
| Takeover caliber | Ø25mm(liquid tube)/Ø42mm(gas tube) | quick connect refrigerant lines |
| Operating weight | 298kg / 580kg / 890kg / 620kg | heavy duty construction |
Intelligent control system
| Functional module | Technical parameters | Industrial scene |
| Control terminal | 7" touchscreen + HONLINK™ mobile APP | remote HVAC monitoring |
| Cluster management | Up to 50 units are controlled synchronously | centralized site cooling |
| Voltage adaptation | Automatic adjustment of 304-480V ±15% | voltage tolerant site AC |
| Fault early warning | 32 types of fault codes + cloud push | predictive maintenance HVAC |
| Energy consumption analysis | Real-time kW/CO₂ emission report | energy efficient temporary cooling |
Environmental adaptability
| Limit parameter | Performance data | Industrial scene |
| Operating temperature | -30℃ to 55℃ (refrigeration) | arctic grade air conditioner |
| Cold start time | It starts up in 45 seconds at -20℃ | mining camp cold start AC |
| Wind resistance grade | Withstand wind speed of 25m/s | coastal construction cooling |
| Salt spray protection certification | 1000hrs (ISO 9227) | offshore temporary HVAC |
| Noise level | 68dB(A) @ 1m (T-42.3) | low noise site office AC |
Installation configuration parameters
| Integration scheme | Engineering Requirements | Industrial scene |
| Air duct interface | 4ר200mm (S-28.9) | high velocity duct connections |
| Power supply requirements | 3PH 380V 50/60Hz | industrial power compatibility |
| Refrigerant | R410A/R32 (optional) | eco friendly refrigerant |
| Installation timeliness | ≤2 hours (standard air duct system) | rapid deployment HVAC |
| Maintain the passage | Three-sided inspection doors + top hoisting points | easy service access AC |